When we develop our products, we do so with the confidence that they will be market leaders. Four factors are key to achieve this goal:When we develop our products, we do so with the confidence that they will be market leaders. Four factors are key to achieve this goal:When we develop our products, we do so with the confidence that they will be market leaders. Four factors are key to achieve this goal:When we develop our products, we do so with the confidence that they will be market leaders. Four factors are key to achieve this goal:

1. What is the scope of buyer’s responsibilities after the contract?

Seller's scope of delivery is specified in this quotation. Unless otherwise agreed, the following supplies and services have to be effected by the buyer:

  • complete power supply to the switch cabinets including power cable and main fuses.
  • complete electrical installation including cable material and laying of pilot lines and power cables with power track/cable channel, protecting tubes between the switch cabinets and the connecting points on the machine.
  • complete drain pipes including insulation from the connecting points of the machine to the exhaust ventilators and on to the roof.
  • foundations or foundation frame and all construction and masonry work.
  • supply lines for all steam connections up to the connecting points on the machine including necessary armatures, valves, pressure reducing valves, condensate container and steam trap, including all necessary insulations.supply lines for all water connections and discharge lines up to the connecting point on the machine including all necessary armatures and valves.
  • all supply lines for compressed air up to the connecting points on the machine including necessary armatures, valves, pressure reduction valves
  • all lines for gas supply including necessary armatures and valves to each consumption point, including main connection, according to the local regulations with pressure reduction valves, gas consumption counter, gas leakage detector etc.
  • all necessary oils and greases for first filling of each aggregate and bearing.
2. What is the normal delivery date of the machine?
Normally, it is 3.5 months after receiving your 100% L/C.
3. What is the warranty period of the machine?
All parts that are subjected to Tung Yang made parts are 12 months warranty after the commissioning of the machine or 16 months after the date of BL, which ever comes earlier.
4. What are the terms of payment that we accept?
  • 100% irrevocable L/C at sight
  • 1 to 2 years usance L/C

 